Australia-wide sales enquiries | 1300 885 295

Australia-wide sales enquiries | 1300 885 295

Level Crossing Removal Project Vic

Vic State Government has major project in progress to remove 75 x Rail Level Crossings – Either roads built over rail or rail over road (Sky Rail) with 46 crossing removals completed to date.

The Level Crossing Removal Project (LXRP) due for completion in 2025 is one of Victoria’s key infrastructure projects; and is designed to improve safety, improve travel time and increase the capacity of Melbourne’s train network.

Mascot Engineering is currently working with several civil contractors to supply a range of GRC Cable Pit and cover solutions in various load ratings to the extensive project. Mascot GRC products are Victrack approved and were specified on projects including  Deer Park, St Albans,  Reservoir, Mernda, South Morang, Hughesdale, Gardiner, Noble Park, Cheltenham, Carrum, Carnegie, Murrumbeena, Oakleigh, Mitcham, Lilydale, Mooroolbark, Caulfield and Bayswater.

Mascot Engineering’s GRC pit solutions are engineered for installations requiring a load rating to Class G, and are cost effective and easy to install. For more information on how Mascot Engineering support key infrastructure projects involving electrical solutions throughout Australia, click here.