Located in Moorabool, just outside Geelong is where you’ll find Australia’s largest lithium-ion battery.
Powered by a 300MW Tesla battery, the Victorian Big Battery stores enough reserve energy to power one million Victorian households for 30min. Not only does it deliver clean, cheap, and reliable energy it contributes greatly to Victoria’s renewable energy target of 50% by 2030.
Mascot Engineering GRC Cable Pits were chosen by the contractor due to the uncertainty of conduit positions at the time of ordering. Mascot GRC Cable Pits don’t have a traditional knockout panel, rather pipe entries can be made on any part of the Pit’s wall. This results in the ultimate level of flexibility on site and allows for last minute changes. It also helped that Mascot GRC Pits are well stocked in Tullamarine.
For more information on our Mascot GRC Cable Pits, click here
If you’d like to know what Mascot Engineering are doing regarding the environment and sustainability, click here